The infrastructure manager should harmonize and correct the differences in the kilometer positions of the track (km 481+800 to 481+400 and km 477+800 to 477+700) that were observed during the analysis of the speed of train no. 81111.
The infrastructure manager should harmonize and correct the differences in the kilometer positions of the track (km 481+800 to 481+400 and km 477+800 to 477+700) that were observed during the analysis of the speed of train no. 81111.