It is recommended that INA – Industrija nafte, d.d., considering certain findings from the assessment of the current state of the INA tanker terminal at the Kaštelanski Basin C of the Split North Port in Solin from the perspective of safety and marine environmental protection, as contained in the marine study of the terminal conducted in 2020, refrain from contracting (ordering) the acceptance of vessels at the said terminal whose overall length (LOA) exceeds 200 meters.
